CSC RO III · Proposed Building — Conceptual Plan To make a PDF, click Print and choose Save as PDF as the destination.
Conceptual building plan · for management presentation

Proposed Four‑Storey Regional Office Building

Location Brgy. Maimpis, City of San Fernando, Pampanga (Regional Government Center) Property Lot 21, Bcs‑03‑003719 · 2,223 m² Budget ceiling ₱150,000,000 (land excluded)
Concept sketch only — not for construction, not a cost quotation
Output 1

Site development sketch

Top view. The lot outline and side lengths come from the certified technical description. The main gate and entrance face DENR, on the 37.92 m side (Road Lot‑6). The long side runs along the perimeter road (Road Lot‑7).

Parking: 31 spaces

Government service vehicles3
Reserved: RD and ARD2
PWD / senior (outside the rear entrance)2
Employees and clients24
Total31

21 spaces sit under the court lines. The 10 spaces in the row beside the building stay outside the court.

How parking and basketball share the yard

  • The rear yard is paved as one flat slab. A full‑size court (15 × 28 m) is painted over the parking lines in a different color.
  • Office hours: the court area is parking (21 spaces).
  • After 5 PM and on weekends: remaining cars use the row beside the building (10 spaces), and the court is free.
  • Rings are on wheeled stands or folding mounts, so nothing is fixed in the driving lanes.

Gates and movement

  • All gates are on the road facing DENR. The pedestrian gate lines up with the main entrance. The vehicle gate (in and out) is at the corner nearest the perimeter road.
  • A 5.5 m driveway runs along the perimeter‑road side to the rear yard. Cars go round a one‑way loop through the parking and come back out the same gate.
  • Covered walkways run along the driveway side and the back of the building. The rear entrance opens straight onto the PWD spaces.
  • Drop‑off point on the driveway at the front corner, a few steps from the entrance.
Output 2

FIRST FLOOR: FRONTLINE SERVICES AND ADMINISTRATION

Building 28 × 26 m = 728 m² per floor. In every sketch the front (facing DENR) is at the bottom, matching the site sketch.

How a client moves

  • Walks in from the DENR road, checks in at reception, and sits in the waiting area (about 100 seats).
  • Faces the ESD counters straight ahead on entering. Window 1 is on the right; Windows 2–4 run to the left, and Releasing is last, beside Stair A.
  • Pays at the cashier window, which faces its own queue area near the elevator.
  • Client restrooms (male, and female/PWD) are just beside the main door. The lactation room is next to them.
  • ARTU / Public Assistance is beside the elevator, with its own receiving area for clients in front of the office.

Staff side

  • MSD area: one office (78 m², 14 staff) holds budget, accounting, procurement and supply & property together, with an MSD meeting room off the office.
  • The cashier (20 m²) has a vault and storage room that can be entered only through the cashier. MSD records open off the main office.
  • ESD area (6 staff): the frontline work area behind the windows, the ESD office, ESD records and the shredding room form one closed area with a single staff door.
  • The supply room is at the back, with a door to the parking area for deliveries.
  • Staff restrooms sit on the back wall, directly under the restrooms on the floors above. The client restrooms by the lobby need a short separate drain line.
Output 3

SECOND FLOOR: EXECUTIVE OFFICES AND SUPPORT DIVISIONS

Layout logic

  • One shared receiving area and secretary (20 m²) serves both the RD and the ARD. It sits between the two offices, with a door into each and a door into the conference room.
  • The conference room is enlarged to 79 m² (20 seats around a long table). It runs along the front, and both the RD's and the ARD's offices open directly into it.
  • Both private quarters are on the DENR (front) side, at either end of the conference room, each entered only from its own office.
  • Executive records (20 m²) open off the RD's office.
  • PSED and PALD sit side by side across the corridor, each with its own records room at the back.

Support spaces

  • The IT Room (40 m²) takes the front corner, with room for 2 staff, a repair bench and racks for spare computers. Its door is on the main corridor.
  • The Field Office Lounge (42 m²) is right beside the elevator.
  • The pantry and restrooms are along the back wall, with a storage room in the back corner.
Output 4

THIRD FLOOR: LEGAL SERVICES, COA AND EMPLOYEE DORMITORY

Privacy by position

  • The hearing room has its own door from the corridor, so parties to a case do not pass through the legal office.
  • A waiting room for parties and witnesses sits across the corridor from the hearing room.
  • COA records can be reached only through the COA office.

Dormitories

  • Male dormitory (95 m²) and female dormitory (84 m², L‑shaped), each with 10 single beds and its own toilet and shower on the back wall.
  • Both dormitories are a few steps from the pantry.
  • A linen closet sits behind the elevator.

Legal Services Division

  • The LSD office is enlarged to 88 m² for 5 staff, with room for the division chief's area.
  • LSD and COA each keep their own records rooms. The general records storage room has been removed.
Output 5

FOURTH FLOOR: HUMAN RESOURCE DIVISION AND MULTIPURPOSE HALL

The hall is on the top floor so the roof can span it without columns inside the room.

Fully open: about 180 seats

  • One hall of 308 m² across the whole front of the floor, with a stage and a large LED screen at one end.
  • About 180 seats theatre‑style, or about 150 at tables for training.
  • The partitions fold into pockets against the front wall when not in use.

Three sections: 50 each

  • Two sliding partitions split the hall into three rooms of about 103 m² each.
  • Each section has its own door from the corridor, so all three can run separate exams or trainings at once.
  • Floor power and data boxes are on a grid under every station position.
  • Section C uses the LED wall. Sections A and B each get a TV or projector screen.
Output 6

Space allocation summary

Approximate areas, read from the sketches. Each floor is 728 m²; the building total is 2,912 m².

Output 7

Preliminary budget summary

High‑level planning estimate at 2026 price levels. It is not a contractor's quotation or a certified construction cost.

Options to stay within ₱150M without dropping required facilities

OptionEffectTrade‑off
Fund office furniture and the LED wall from a separate, later allocation−₱7.5MRestores a 10% contingency. Items are bought in Year 2.
Use folding (accordion) partitions instead of soundproof sliding walls−₱1.0MNoise passes between sections during simultaneous exams.
Trim about 5% of floor area (huddle room, witness waiting room, training storage)−₱5.0MLess storage and lounge space; required offices unchanged.
Phase the standby generator to a later year−₱2.5MNo backup power for exams during outages until installed.